Project Boundary & Data Inputs
Load Demo Project
SPATIAL CANVAS — EPSG:4326
⊕
Draw Boundary
⤢
Upload Shapefile
⧉
Layers
⊙
Zoom to Fit
Project Boundary
Project Name
Project Type
CAPEX Estimate (USD M)
Loan Request (USD M)
Project Life (years)
Coordinates (lat, lon)
Geospatial Datasets — Select Active Layers
Sentinel-2
SRTM DEM
Copernicus DEM
CHIRPS Rainfall
Landsat
ALOS PALSAR-2
WorldPop
OSM Roads
Global Forest Change
GEDI Canopy
ESA WorldCover
MODIS Fire
Protected Areas
Key Biodiversity Areas
Water Stress
Global Power Plants
Flood Risk Intelligence — Results
HIGH RISK
Export GeoTIFF
Analysis Pipeline100%
FLOOD EXPOSURE MAP — 100yr RETURN PERIOD
Mine Boundary
100yr Flood Zone
Flood Depth >1m
SCHEMA ANALYSIS ✓
CRS: EPSG:32648
Bands: 4 (RGB+NIR)
Resolution: 10m
Cloud Cover: 3.2%
Flood Frequency Score
8.4/10
100-yr return period · High severity
Flood Depth Estimate
1.8m
Peak inundation depth at boundary
Asset Exposure
34%
Of total project footprint at risk
Annual Exceedance Prob.
1.2%
Based on CHIRPS 30-yr analysis
Module Risk Breakdown
Financial Impact Estimates
Construction Delay Prob.
38%
Expected 6–14 month delay window
Estimated Annual Loss
$18M
Revenue-at-risk per year
Required Contingency
$45M
Flood protection CAPEX
Opex Uplift (annual)
$3.2M
Pump & drainage operations
Investment Committee Dashboard
Oyu Tolgoi · USD 500M · 2026-06-03
72
Climate Risk
68
Nature Risk
55
Social Risk
B+
Bankability
Financial Impact Summary
| Risk Factor | Risk Level | Financial Impact | Type |
|---|---|---|---|
| Flood Risk (100yr) | HIGH | +$45M CAPEX | Construction |
| Biodiversity Offset | HIGH | $34M | Compliance |
| Community Resettlement | MOD | $48M | Social |
| Water Security | MOD | $18M/yr | Revenue-at-Risk |
| Infrastructure Gap | MOD | +$32M CAPEX | Construction |
| Climate Transition | LOW | Monitored | ESG |
⬡ GISclaw Credit Recommendation
Loan Request
USD 400M
Approved Debt Capacity
USD 320M
Reserve Requirement
USD 65M
Margin Adjustment
+75 bps
DSCR Covenant Floor
1.35×
Conditions Precedent
Flood EPC + ESIA
Scenario Comparison
BASE CASE
USD 320M
+75bps · 65M reserve
MOD RISK
UPSIDE — FLOOD PROTECTION BUILT
USD 370M
+50bps · 35M reserve
LOW RISK
DOWNSIDE — BIODIVERSITY TRIGGER
USD 200M
+140bps · 100M reserve
HIGH RISK
Agentic Asset Monitoring
Configure Alerts
Last Sentinel-2 Pass
2026-05-31
3 days ago · Cloud 6.1%
Rainfall Anomaly (30d)
+142%
Above 30yr mean — Alert active
NDVI Change
+3.1%
Vegetation recovery detected
Covenant Monitoring
| Covenant | Threshold | Current | Status |
|---|---|---|---|
| DSCR (trailing 12m) | ≥ 1.35× | 1.52× | PASS |
| Flood Reserve | ≥ USD 65M | $68.2M | PASS |
| Biodiversity ESIA | Filed & Active | In review | WATCH |
| Rainfall 30d Alert | < 130% mean | 142% | BREACH |
⚠ ACTIVE ALERT — 2026-06-03 04:12 UTC
CHIRPS satellite rainfall anomaly detected: +142% above 30-year mean in project catchment area. GISclaw recommends triggering flood covenant review and requesting updated drainage engineer's report within 30 days.